{"id":3968,"date":"2026-03-30T10:11:43","date_gmt":"2026-03-30T08:11:43","guid":{"rendered":"https:\/\/fixsus.be\/projects\/"},"modified":"2026-10-21T11:38:37","modified_gmt":"2026-10-21T09:38:37","slug":"projects","status":"publish","type":"page","link":"https:\/\/fixsus.be\/en\/projects\/","title":{"rendered":"Projects"},"content":{"rendered":"\n<div class=\"wp-block-media-text alignfull has-media-on-the-right is-stacked-on-mobile is-image-fill-element boxed-left header-variant-beigeBol-foto has-green-to-transparent-gradient-background has-background\" style=\"padding-top:var(--wp--preset--spacing--80-40);padding-bottom:var(--wp--preset--spacing--64-32)\"><div class=\"wp-block-media-text__content\">\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-container-core-group-is-layout-9bf98879 wp-block-group-is-layout-constrained\" style=\"padding-top:var(--wp--preset--spacing--64-32);padding-right:var(--wp--preset--spacing--16-8);padding-bottom:var(--wp--preset--spacing--64-32);padding-left:var(--wp--preset--spacing--16-8)\">\n<h1 class=\"wp-block-heading has-white-color has-text-color has-link-color has-display-font-size wp-elements-1\" style=\"margin-top:0;margin-bottom:var(--wp--preset--spacing--24-16)\">A single partner for the entire process<\/h1>\n\n\n\n<p class=\"has-white-color has-text-color has-link-color has-hero-body-text-font-size wp-elements-2 wp-block-paragraph\"><strong><em>From initial analysis to ongoing peace of mind.<\/em><\/strong><\/p>\n\n\n\n<p class=\"has-white-color has-text-color has-link-color has-hero-body-text-font-size wp-elements-3 wp-block-paragraph\">Fixsus does not just provide a building management system or the hardware within it. We take responsibility for the entire process: the analysis of your building&#8217;s needs, the design, installation, and programming, followed by the maintenance that keeps everything running for years. You have a single partner overseeing the whole, from the initial plan to long after completion.  <\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/fixsus.be\/en\/total-care\/\">See how we support you<\/a><\/div>\n<\/div>\n<\/div>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/185-FIXSUS-Kantoor-Evergem-LR-163-1024x683.jpg\" alt=\"\" class=\"wp-image-1318 size-full\" style=\"object-position:50% 50%\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/185-FIXSUS-Kantoor-Evergem-LR-163-1024x683.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/185-FIXSUS-Kantoor-Evergem-LR-163-300x200.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/185-FIXSUS-Kantoor-Evergem-LR-163-768x512.jpg 768w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/185-FIXSUS-Kantoor-Evergem-LR-163-1536x1024.jpg 1536w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/185-FIXSUS-Kantoor-Evergem-LR-163.jpg 1800w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n<div class=\"wp-block-group techniekenDetail-tiba3 has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\" style=\"padding-top:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24)\">\n<h2 class=\"wp-block-heading has-text-align-center\">Realizations<\/h2>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">From historic city buildings to residential care centers and critical infrastructure. Every project began with a specific requirement and received a tailored solution. <\/p>\n<\/div>\n\n<div class=\"wp-block-group alignwide Projecten-overzicht has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\" style=\"padding-top:var(--wp--preset--spacing--12-8);padding-bottom:var(--wp--preset--spacing--64-32)\">\n<div class=\"wp-block-query alignwide is-layout-flow wp-block-query-is-layout-flow\">\n<div\n\tclass=\"rudr-taxonomy-filter--links wp-block-rudr-taxonomy-filter\"\tdata-wp-interactive=\"rudr\"\n\tdata-wp-context='{\"isExpanded\":false}'>\n\t\t\t\t\t\t\t\t<span>\n\t\t\t\t\t\t\t\t<a href=\"\/en\/wp-json\/wp\/v2\/pages\/3968\" class=\"rudr-filter-current\" data-wp-on--click=\"core\/query::actions.navigate\" data-wp-on-async--mouseenter=\"core\/query::actions.prefetch\" data-wp-watch=\"core\/query::callbacks.prefetch\">All realizations<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"\/en\/wp-json\/wp\/v2\/pages\/3968?query-0-page=1&#038;filter-0-project=public-property\" data-wp-on--click=\"core\/query::actions.navigate\" data-wp-on-async--mouseenter=\"core\/query::actions.prefetch\" data-wp-watch=\"core\/query::callbacks.prefetch\">Public property<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"\/en\/wp-json\/wp\/v2\/pages\/3968?query-0-page=1&#038;filter-0-project=healthcare\" data-wp-on--click=\"core\/query::actions.navigate\" data-wp-on-async--mouseenter=\"core\/query::actions.prefetch\" data-wp-watch=\"core\/query::callbacks.prefetch\">Healthcare<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"\/en\/wp-json\/wp\/v2\/pages\/3968?query-0-page=1&#038;filter-0-project=tourism-and-leisure\" data-wp-on--click=\"core\/query::actions.navigate\" data-wp-on-async--mouseenter=\"core\/query::actions.prefetch\" data-wp-watch=\"core\/query::callbacks.prefetch\">Tourism and Leisure<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"\/en\/wp-json\/wp\/v2\/pages\/3968?query-0-page=1&#038;filter-0-project=office-buildings\" data-wp-on--click=\"core\/query::actions.navigate\" data-wp-on-async--mouseenter=\"core\/query::actions.prefetch\" data-wp-watch=\"core\/query::callbacks.prefetch\">Office buildings<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"\/en\/wp-json\/wp\/v2\/pages\/3968?query-0-page=1&#038;filter-0-project=retail-warehouse\" data-wp-on--click=\"core\/query::actions.navigate\" data-wp-on-async--mouseenter=\"core\/query::actions.prefetch\" data-wp-watch=\"core\/query::callbacks.prefetch\">Retail &amp; warehouse<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"\/en\/wp-json\/wp\/v2\/pages\/3968?query-0-page=1&#038;filter-0-project=diverse\" data-wp-on--click=\"core\/query::actions.navigate\" data-wp-on-async--mouseenter=\"core\/query::actions.prefetch\" data-wp-watch=\"core\/query::callbacks.prefetch\">Diverse<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<\/div>\n\n\n<ul class=\"wp-block-post-template is-layout-grid wp-container-core-post-template-is-layout-46a98e94 wp-block-post-template-is-layout-grid\"><li class=\"wp-block-post post-3357 realisatie type-realisatie status-publish has-post-thumbnail hentry project-public-property realisatie-locatie-brussel\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1244\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/Sint-Joost-ten-Node-Hendrik_Consciencegebouw_5-scaled.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/Sint-Joost-ten-Node-Hendrik_Consciencegebouw_5-scaled.jpg 2560w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/Sint-Joost-ten-Node-Hendrik_Consciencegebouw_5-300x146.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/Sint-Joost-ten-Node-Hendrik_Consciencegebouw_5-1024x498.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/Sint-Joost-ten-Node-Hendrik_Consciencegebouw_5-768x373.jpg 768w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/Sint-Joost-ten-Node-Hendrik_Consciencegebouw_5-1536x747.jpg 1536w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/Sint-Joost-ten-Node-Hendrik_Consciencegebouw_5-2048x996.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/public-property\/\" rel=\"tag\">Public property<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Hendrik Conscience Building<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">At the Hendrik Conscience Building, the existing control system per tower is being replaced without the need for major works.<\/p>\nThe existing Modbus cabling is retained, while Room Controllers and TP10 panels take over the room control and expand it with additional measurements. Everything is integrated into a single serverless, NIS2-compliant management environment based on industrial technology.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-4002 realisatie type-realisatie status-publish has-post-thumbnail hentry project-healthcare realisatie-locatie-ingelmunster\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1013\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/81-FIXSUS-WZC-Ingelmunster-LR-081.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Woonzorgcentrum na retrofit van het gebouwbeheersysteem door Fixsus\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/81-FIXSUS-WZC-Ingelmunster-LR-081.jpg 1800w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/81-FIXSUS-WZC-Ingelmunster-LR-081-300x169.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/81-FIXSUS-WZC-Ingelmunster-LR-081-1024x576.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/81-FIXSUS-WZC-Ingelmunster-LR-081-768x432.jpg 768w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/81-FIXSUS-WZC-Ingelmunster-LR-081-1536x864.jpg 1536w\" sizes=\"auto, (max-width: 1800px) 100vw, 1800px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/healthcare\/\" rel=\"tag\">Healthcare<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">WZC Maria Rustoord<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">WZC Maria Rustoord has grown into a campus for 180 residents, featuring four boiler rooms, eight boilers, and three combined heat and power units.<\/p>\nFixsus integrated the scattered control systems into a single platform while preserving the well-functioning installations. The technical department can now monitor the entire site centrally and make targeted adjustments. \n\n<a href=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/Blog-WZC-Maria-Rustoord.pdf\" target=\"_blank\" rel=\"noopener\">Read the visit report<\/a><\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-4016 realisatie type-realisatie status-publish has-post-thumbnail hentry project-public-property realisatie-locatie-antwerpen\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"2034\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/vlinderpaleis-scaled.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/vlinderpaleis-scaled.jpg 2560w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/vlinderpaleis-300x238.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/vlinderpaleis-1024x814.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/vlinderpaleis-768x610.jpg 768w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/vlinderpaleis-1536x1220.jpg 1536w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/vlinderpaleis-2048x1627.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/public-property\/\" rel=\"tag\">Public property<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Vlinderpaleis (Antwerp Law Courts)<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">At the Vlinderpaleis in Antwerp, Fixsus renewed the building automation without interrupting the daily operations of the courthouse.<\/p>\nThe retrofit brings the various technologies together into one open and centrally managed system, providing a future-oriented basis for maintenance and further optimization.\n\n\u00a0\n\n\u00a0\n\n\u00a0\n\n\u00a0\n\n\u00a0\n\n\u00a0\n\n\u00a0\n\n\u00a0<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3851 realisatie type-realisatie status-publish has-post-thumbnail hentry project-public-property realisatie-locatie-brugge\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"615\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/concertgebouw-brugge1.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/concertgebouw-brugge1.jpg 1000w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/concertgebouw-brugge1-300x185.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/concertgebouw-brugge1-768x472.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/public-property\/\" rel=\"tag\">Public property<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Concertgebouw Brugge<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">At Concertgebouw Brugge, Fixsus replaced the existing HVAC control system with a single central building management system.<\/p>\nA redundant Beckhoff controller communicates with 41 islands and controls heating, cooling, and ventilation in cascade, fed by 47 Room Analyzers. Fire detection, emergency lighting, and fire dampers are also integrated for rapid alarm follow-up.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3747 realisatie type-realisatie status-publish has-post-thumbnail hentry project-public-property realisatie-locatie-antwerpen\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"365\" height=\"547\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/images-3.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/images-3.jpg 365w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/images-3-200x300.jpg 200w\" sizes=\"auto, (max-width: 365px) 100vw, 365px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/public-property\/\" rel=\"tag\">Public property<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Rubenshuis Hopland 13<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">Hopland 13 is the reception building of the Rubens site in Antwerp, featuring an experience center, museum caf\u00e9, reading room, and library.<\/p>\nTIBA3 monitors temperature, humidity, and air quality, and controls the VAV regulation, zoning, and climate control. The hybrid installation, featuring geothermal energy and heat pumps, is prepared for expansion to the other buildings on the site.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3498 realisatie type-realisatie status-publish has-post-thumbnail hentry project-tourism-and-leisure realisatie-locatie-brussel\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"628\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/vandervalk.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/vandervalk.jpg 1200w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/vandervalk-300x157.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/vandervalk-1024x536.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/vandervalk-768x402.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/tourism-and-leisure\/\" rel=\"tag\">Tourism and Leisure<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Van der Valk Hotel Brussels Airport<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">At Van der Valk Hotel Brussels Airport, Fixsus replaced the existing controls with a single central building management system.<\/p>\nThe retrofit bundles hotel technologies without unnecessary replacement of infrastructure and gives the technical department more control over comfort, energy consumption, and daily operations.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3367 realisatie type-realisatie status-publish has-post-thumbnail hentry project-healthcare realisatie-locatie-lochristi realisatie-locatie-lokeren\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"720\" height=\"360\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/emiliani.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/emiliani.jpg 720w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/emiliani-300x150.jpg 300w\" sizes=\"auto, (max-width: 720px) 100vw, 720px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/healthcare\/\" rel=\"tag\">Healthcare<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">MFC Emiliani<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">For the MFC Emiliani locations in Lokeren and Lochristi, Fixsus controls the HVAC and screens in the resident rooms and living areas.<\/p>\nThe rooms are managed centrally, with additional local adjustments via Room Controllers where necessary. In this way, the system combines central management with comfort at the room level.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-4083 realisatie type-realisatie status-publish has-post-thumbnail hentry project-public-property realisatie-locatie-brussel\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"534\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/de-horizon-van-brussel-gebouwen-van-brussel-belgie-68686480.webp\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/de-horizon-van-brussel-gebouwen-van-brussel-belgie-68686480.webp 800w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/de-horizon-van-brussel-gebouwen-van-brussel-belgie-68686480-300x200.webp 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/04\/de-horizon-van-brussel-gebouwen-van-brussel-belgie-68686480-768x513.webp 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/public-property\/\" rel=\"tag\">Public property<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Flemish government building<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">In a large Flemish government building in Brussels, Fixsus renewed the building management system without demolition work or significant disruption to users.<\/p>\nThe open, central control system reuses existing infrastructure and makes the building manageable, expandable, and ready for long-term support once again.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3875 realisatie type-realisatie status-publish has-post-thumbnail hentry project-office-buildings realisatie-locatie-hasselt\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"947\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/Fixsus-project-placeholde-beeld.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/Fixsus-project-placeholde-beeld.jpg 960w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/Fixsus-project-placeholde-beeld-300x296.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/03\/Fixsus-project-placeholde-beeld-768x758.jpg 768w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/office-buildings\/\" rel=\"tag\">Office buildings<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Flemish Administrative Centre<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">At the Flemish Administrative Centre in Hasselt, Fixsus integrates all building technologies into a single centrally controlled system.<\/p>\nUniform operation provides the technical department with greater insight and control, simplifies the management of the complex building, and supports structural energy optimization.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3450 realisatie type-realisatie status-publish has-post-thumbnail hentry project-tourism-and-leisure realisatie-locatie-mechelen\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/hotel-ve-1.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/hotel-ve-1.jpg 1500w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/hotel-ve-1-300x200.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/hotel-ve-1-1024x683.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/hotel-ve-1-768x512.jpg 768w\" sizes=\"auto, (max-width: 1500px) 100vw, 1500px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/tourism-and-leisure\/\" rel=\"tag\">Tourism and Leisure<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Hotel V\u00e9<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\">A boutique hotel located at the Vismarkt in the heart of Mechelen, where a single boiler room supplies ceiling heating, underfloor heating, radiators, and domestic hot water.\n\nTIBA3 controls the two boilers in cascade as well as the air handling unit with heat recovery. Fixsus monitors everything remotely and often detects a malfunction before the hotel even notices it.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-4063 realisatie type-realisatie status-publish has-post-thumbnail hentry project-public-property\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2048\" height=\"1377\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bpost.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bpost.jpg 2048w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bpost-300x202.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bpost-1024x689.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bpost-768x516.jpg 768w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bpost-1536x1033.jpg 1536w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/public-property\/\" rel=\"tag\">Public property<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Bpost<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">Various bpost sites are monitored from a single uniform management environment. Heating, cooling, ventilation, and free cooling operate according to the same logic everywhere, with central monitoring of fault contacts. <\/p>\n<p class=\"isSelectedEnd\">The result is a clear and repeatable approach that can be easily expanded to additional buildings.<\/p><\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3508 realisatie type-realisatie status-publish has-post-thumbnail hentry project-diverse realisatie-locatie-luxemburg\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1680\" height=\"1120\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/sudcal.avif\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/sudcal.avif 1680w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/sudcal-300x200.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/sudcal-1024x683.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/sudcal-768x512.jpg 768w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/sudcal-1536x1024.jpg 1536w\" sizes=\"auto, (max-width: 1680px) 100vw, 1680px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/diverse\/\" rel=\"tag\">Diverse<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Sudcal district heating network<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">The Sudcal district heating network in Luxembourg recovers waste heat from ArcelorMittal&#8217;s Belval site, covering 60 to 70 percent of the heat demand.<\/p>\nFixsus controls the production unit and all substations, reads the calorimeters, and consolidates the consumption reporting into a single central system.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-4057 realisatie type-realisatie status-publish has-post-thumbnail hentry project-tourism-and-leisure realisatie-locatie-putte\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1146\" height=\"765\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/sporthal-putte-6.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/sporthal-putte-6.jpg 1146w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/sporthal-putte-6-300x200.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/sporthal-putte-6-1024x684.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/sporthal-putte-6-768x513.jpg 768w\" sizes=\"auto, (max-width: 1146px) 100vw, 1146px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/tourism-and-leisure\/\" rel=\"tag\">Tourism and Leisure<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Putte Municipal Sports Hall<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">At the renovated sports hall in Putte, Fixsus is implementing the building management system, commissioned by Deckx Elektromechanica.<\/p>\nThe system controls the lighting, air handling units, and central heating, and monitors the emergency lighting. TP10 panels and PIR sensors provide local control and detection throughout the building.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3965 realisatie type-realisatie status-publish has-post-thumbnail hentry project-office-buildings\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1502\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bank-breda-scaled.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bank-breda-scaled.jpg 2560w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bank-breda-300x176.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bank-breda-1024x601.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bank-breda-768x451.jpg 768w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bank-breda-1536x901.jpg 1536w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/06\/bank-breda-2048x1202.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/office-buildings\/\" rel=\"tag\">Office buildings<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Bank van Breda<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">In about ten Bank van Breda buildings, Fixsus centrally controls the lighting, heating, window contacts, screens, emergency lighting, and data rooms.<\/p>\nThe control system follows occupancy, ensuring that unoccupied spaces are not unnecessarily heated or lit. Furthermore, Fixsus developed a Modbus parking detector for the head office, which is fully integrated into TIBA3.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3335 realisatie type-realisatie status-publish has-post-thumbnail hentry project-healthcare realisatie-locatie-oudenaarde\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/04-scaled-1.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/04-scaled-1.jpg 2560w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/04-scaled-1-300x225.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/04-scaled-1-1024x768.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/04-scaled-1-768x576.jpg 768w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/04-scaled-1-1536x1152.jpg 1536w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/04-scaled-1-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/healthcare\/\" rel=\"tag\">Healthcare<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">WZC Saffrou<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">On the former Saffrou site in Oudenaarde, Anima Care is constructing a residential care center with 86 rooms and adjacent assisted living residences.<\/p>\nFixsus integrates lighting, ventilation, and heating into a single building management system, featuring local control via Fixsus hardware. Nurse call systems are also monitored and forwarded to the DECT exchange.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3403 realisatie type-realisatie status-publish has-post-thumbnail hentry project-office-buildings\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"356\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/fluvius.avif\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/fluvius.avif 600w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/fluvius-300x178.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/office-buildings\/\" rel=\"tag\">Office buildings<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Fluvius<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">Fixsus equipped several Fluvius buildings with TIBA3 for the centralized control of energy-efficient installations.<\/p>\nIn 2024 alone, three locations were provided with a building management system by Fixsus. These successive realizations form the basis for a growing partnership.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-4066 realisatie type-realisatie status-publish has-post-thumbnail hentry project-tourism-and-leisure realisatie-locatie-zaventem\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2500\" height=\"1407\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/hotelopsterea.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/hotelopsterea.jpg 2500w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/hotelopsterea-300x169.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/hotelopsterea-1024x576.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/hotelopsterea-768x432.jpg 768w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/hotelopsterea-1536x864.jpg 1536w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/hotelopsterea-2048x1153.jpg 2048w\" sizes=\"auto, (max-width: 2500px) 100vw, 2500px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/tourism-and-leisure\/\" rel=\"tag\">Tourism and Leisure<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">Radisson Collection &#8216;The National&#8217;<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">For Radisson Collection The National Hotel, Brussels, Fixsus supplied various hardware components for building and comfort control.<\/p>\nThe devices are integrated into the hotel at the Sterea site in Sterrebeek and support a comfortable and intuitive hotel experience for guests.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3285 realisatie type-realisatie status-publish has-post-thumbnail hentry project-public-property realisatie-locatie-gent\">\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group featured-image-realisatie has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\"><figure style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"940\" height=\"1080\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/ardoyen.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"border-top-left-radius:40px;border-top-right-radius:40px;height:240px;object-fit:cover;\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/ardoyen.jpg 940w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/ardoyen-261x300.jpg 261w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/ardoyen-891x1024.jpg 891w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/07\/ardoyen-768x882.jpg 768w\" sizes=\"auto, (max-width: 940px) 100vw, 940px\" \/><\/figure>\n\n<div class=\"taxonomy-project wp-block-post-terms\"><a href=\"https:\/\/fixsus.be\/en\/project\/public-property\/\" rel=\"tag\">Public property<\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-white-50-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-fb7c55c3 wp-block-group-is-layout-constrained\" style=\"border-bottom-left-radius:40px;border-bottom-right-radius:40px;margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--32-24);padding-right:var(--wp--preset--spacing--32-24);padding-bottom:var(--wp--preset--spacing--32-24);padding-left:var(--wp--preset--spacing--32-24)\"><h5 style=\"margin-top:0;margin-bottom:0\" class=\"wp-block-post-title\">UGent Campus Ardoyen<\/h5>\n\n\n<div class=\"project-overzicht-info\">\n\n            <div class=\"project-slide-info-block project-slide-omschrijving\">\n            <div class=\"project-slide-content\"><p class=\"isSelectedEnd\">At UGent Campus Ardoyen, toilets are flushed using a combination of rainwater and locally treated wastewater.<\/p>\nTIBA3 monitors the water supply per building, determines priorities for critical zones, and controls the treatment process based on demand. A subsequent step involves proactive adjustments based on weather forecasts.<\/div>\n        <\/div>\n    \n    \n<\/div>\n<\/div>\n<\/div>\n\n<\/li><\/ul>\n\n<nav class=\"wp-block-query-pagination is-content-justification-center is-layout-flex wp-container-core-query-pagination-is-layout-f80becac wp-block-query-pagination-is-layout-flex\" aria-label=\"Pagination\">\n<div class=\"wp-block-query-pagination-numbers\"><span aria-current=\"page\" class=\"page-numbers current\">1<\/span>\n<a class=\"page-numbers\" href=\"?query-0-page=2\">2<\/a><\/div>\n<\/nav>\n\n<\/div>\n<\/div>\n\n<div class=\"wp-block-columns alignwide are-vertically-aligned-center Kenningsmaking-block has-primary-background-color has-background is-layout-flex wp-container-core-columns-is-layout-c03d73b4 wp-block-columns-is-layout-flex\" style=\"border-radius:40px;margin-top:var(--wp--preset--spacing--64-32);margin-bottom:var(--wp--preset--spacing--128-65);padding-top:var(--wp--preset--spacing--64-32);padding-right:var(--wp--preset--spacing--64-32);padding-bottom:var(--wp--preset--spacing--64-32);padding-left:var(--wp--preset--spacing--64-32)\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:60%\">\n<h2 class=\"wp-block-heading\">Let&#8217;s get introduced<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">We are happy to assist you with any questions regarding your building management system.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:40%\">\n<div class=\"wp-block-buttons is-content-justification-right is-layout-flex wp-container-core-buttons-is-layout-a2162bf0 wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/fixsus.be\/en\/contact\/advice-and-sales\/\">Introductory meeting<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Realizations From historic city buildings to residential care centers and critical infrastructure. Every project began with a specific requirement and received a tailored solution.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"class_list":["post-3968","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/pages\/3968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/comments?post=3968"}],"version-history":[{"count":6,"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/pages\/3968\/revisions"}],"predecessor-version":[{"id":5294,"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/pages\/3968\/revisions\/5294"}],"wp:attachment":[{"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/media?parent=3968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}