{"id":4018,"date":"2026-10-02T16:11:38","date_gmt":"2026-10-02T14:11:38","guid":{"rendered":"https:\/\/fixsus.be\/bacs-compliant-without-replacing-everything\/"},"modified":"2026-10-20T13:10:35","modified_gmt":"2026-10-20T11:10:35","slug":"bacs-compliant-without-replacing-everything","status":"publish","type":"post","link":"https:\/\/fixsus.be\/en\/bacs-compliant-without-replacing-everything\/","title":{"rendered":"BACS-compliant without replacing everything"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"419\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/bacs-conform-overzicht-1024x419.jpg\" alt=\"Control cabinet with Beckhoff EtherCAT modules, power supplies, and cabling\" class=\"wp-image-3194\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/bacs-conform-overzicht-1024x419.jpg 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/bacs-conform-overzicht-300x123.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/bacs-conform-overzicht-768x314.jpg 768w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/bacs-conform-overzicht-1536x629.jpg 1536w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/bacs-conform-overzicht.jpg 1960w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p class=\"wp-block-paragraph\">In many buildings, the building management system has been running for nearly ten years. At a certain point, the system is no longer supported and spare parts become difficult to obtain. It then seems like there is only one way out: replacing the entire control system, with the associated costs and works.  <\/p>\n\n<p class=\"wp-block-paragraph\">Since the end of 2025, the BACS obligation has been added to this. For many building managers, this coincides with an installation reaching the end of its lifespan. This is a good time to approach the question differently: what truly needs to be replaced, and what can stay?  <\/p>\n\n<h2 class=\"wp-block-heading\">What the law requires<\/h2>\n\n<p class=\"wp-block-paragraph\">Every non-residential building with a heating or cooling system of more than 290 kW must have a BACS. Heating and cooling are considered separately. By the end of 2029 at the latest, the threshold will drop to 70 kW.  <\/p>\n\n<p class=\"wp-block-paragraph\">The system must measure energy consumption and store it for five years, communicate with all your installations\u2014including those from different brands\u2014and provide alarms in case of deviations. It must detect efficiency losses, prevent heating and cooling from working against each other, and optimize the use of own solar energy or waste heat. Additionally, it monitors temperature, humidity, and CO\u2082 per 100 m\u00b2.  <\/p>\n\n<figure class=\"wp-block-image size-large\" style=\"margin-top:0\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"383\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/bacs-drempels-en-vereisten-1024x383.png\" alt=\"Threshold values for BACS: 290 kW since December 31, 2025, and 70 kW from 2030, with the seven requirements from A to G: energy monitoring, linking technologies, analysis, efficiency, renewables, lighting, and indoor air.\" class=\"wp-image-3214\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/bacs-drempels-en-vereisten-1024x383.png 1024w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/bacs-drempels-en-vereisten-300x112.png 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/bacs-drempels-en-vereisten-768x287.png 768w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/bacs-drempels-en-vereisten.png 1155w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p class=\"wp-block-paragraph\">The energy expert verifies this using the <a href=\"https:\/\/www.vlaanderen.be\/gebouwautomatisering-en-controlesystemen-voor-niet-residentiele-gebouwen-verplicht-tegen-eind-2025\" target=\"_blank\" rel=\"noreferrer noopener\">BACS supporting document<\/a> from the Flemish Energy and Climate Agency, a spreadsheet with a yes or no for each requirement. You can fill it out yourself to know exactly what is missing in your building. <\/p>\n\n<h2 class=\"wp-block-heading\">What is not mandatory<\/h2>\n\n<p class=\"wp-block-paragraph\">The regulations do not require your installations to be new. Existing meters may remain if they are readable and meet the requirements of the EPC NR. Lighting only counts from 2028 and does not need to be linked to the system even then. The mandatory alarm procedure is primarily an organizational agreement regarding who receives which alarm and what happens next. You can already draft this today.    <\/p>\n\n<h2 class=\"wp-block-heading\">The problem lies in the control cabinet<\/h2>\n\n<p class=\"wp-block-paragraph\">In most buildings, the fans, valves, pumps, and sensors are still working fine. What is outdated is the controller that manages them. Replacing that is different from replacing the entire system.  <\/p>\n\n<div class=\"wp-block-group alignfull gap-120 z-index-2 has-white-color has-secondary-background-color has-text-color has-background has-link-color wp-elements-1 has-global-padding is-layout-constrained wp-container-core-group-is-layout-1df87aa0 wp-block-group-is-layout-constrained\" style=\"border-radius:45px;margin-top:var(--wp--preset--spacing--64-32);margin-bottom:var(--wp--preset--spacing--64-32);padding-top:var(--wp--preset--spacing--40-32);padding-right:var(--wp--preset--spacing--40-32);padding-bottom:var(--wp--preset--spacing--40-32);padding-left:var(--wp--preset--spacing--40-32)\">\n<div class=\"wp-block-group is-layout-flex wp-container-core-group-is-layout-146a4137 wp-block-group-is-layout-flex\">\n<figure class=\"wp-block-image size-full is-resized is-style-rounded wp-container-content-6884ef2a\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"600\" src=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/maxime-hellebuyck-fixsus-quote.jpg\" alt=\"Maxime Hellebuyck, COO of Fixsus, shows a building floor plan in TIBA3\" class=\"wp-image-3199\" style=\"object-fit:cover;width:329px;height:auto\" srcset=\"https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/maxime-hellebuyck-fixsus-quote.jpg 600w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/maxime-hellebuyck-fixsus-quote-300x300.jpg 300w, https:\/\/fixsus.be\/wp-content\/uploads\/2026\/10\/maxime-hellebuyck-fixsus-quote-150x150.jpg 150w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-white-color has-text-color has-link-color wp-elements-2 wp-container-content-231d8afb\">&#8220;The fans and valves usually still work perfectly; it is only the controller that is worn out. In that case, you don&#8217;t just discard the entire installation.&#8221;<\/h2>\n<\/div>\n\n\n\n<p class=\"has-text-align-right wp-block-paragraph\">Maxime Hellebuyck, COO of Fixsus<\/p>\n<\/div>\n\n<p class=\"wp-block-paragraph\">During a retrofit to TIBA3, the sensors, valves, and actuators are retained, along with their cabling. The control equipment in the cabinets is replaced on-site with Beckhoff components, managed by a single PLC for the entire building. Old thermostats and local controls are replaced by simple Modbus devices, which a technician can easily maintain or replace later. You receive new electrical diagrams and a digital as-built file. Where meters or sensors are missing for BACS, they are added. The works are carried out in phases while the building remains in use.     <\/p>\n\n<p class=\"wp-block-paragraph\">Because TIBA3 works with open protocols such as BACnet, Modbus, KNX, and M-Bus, your installation remains maintainable by any technician familiar with them even after the conversion. Beckhoff is standard industrial hardware, and you receive 25 years of support on the supplied materials. When something needs to change later, you decide when and with whom.  <\/p>\n\n<h2 class=\"wp-block-heading\">Know what can stay<\/h2>\n\n<p class=\"wp-block-paragraph\">During a technical walkthrough, we will examine your control cabinets, meters, and sensors together and review the supporting document for your building. Afterwards, you will know what can be retained, what is needed to be BACS-compliant, and how this can be achieved in phases. <\/p>\n\n<p class=\"wp-block-paragraph\">Schedule a walkthrough via the <a href=\"https:\/\/fixsus.be\/en\/contact\/advice-and-sales\/\">contact form<\/a> or call +32 (0)9 393 46 00.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Your building management system is due for replacement and BACS is just around the corner. Often, renewing the control cabinet is sufficient. Sensors, valves, and cabling simply remain in place.  <\/p>\n","protected":false},"author":3,"featured_media":5147,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[144,142],"class_list":["post-4018","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regulations","category-retrofit-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/posts\/4018","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/comments?post=4018"}],"version-history":[{"count":1,"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/posts\/4018\/revisions"}],"predecessor-version":[{"id":4020,"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/posts\/4018\/revisions\/4020"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/media\/5147"}],"wp:attachment":[{"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/media?parent=4018"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fixsus.be\/en\/wp-json\/wp\/v2\/categories?post=4018"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}