A single partner for the entire process

Realizations

From historic city buildings to residential care centers and critical infrastructure. Every project began with a specific requirement and received a tailored solution.

  • Van der Valk Hotel Brussels Airport

    At Van der Valk Hotel Brussels Airport, Fixsus replaced the existing controls with a single central building management system.

    The retrofit bundles hotel technologies without unnecessary replacement of infrastructure and gives the technical department more control over comfort, energy consumption, and daily operations.
  • Hotel Vé
    A boutique hotel located at the Vismarkt in the heart of Mechelen, where a single boiler room supplies ceiling heating, underfloor heating, radiators, and domestic hot water. TIBA3 controls the two boilers in cascade as well as the air handling unit with heat recovery. Fixsus monitors everything remotely and often detects a malfunction before the hotel even notices it.
  • Putte Municipal Sports Hall

    At the renovated sports hall in Putte, Fixsus is implementing the building management system, commissioned by Deckx Elektromechanica.

    The system controls the lighting, air handling units, and central heating, and monitors the emergency lighting. TP10 panels and PIR sensors provide local control and detection throughout the building.
  • Radisson Collection ‘The National’

    For Radisson Collection The National Hotel, Brussels, Fixsus supplied various hardware components for building and comfort control.

    The devices are integrated into the hotel at the Sterea site in Sterrebeek and support a comfortable and intuitive hotel experience for guests.
  • Gare55
    An old station building in Evergem, reborn as a bed and breakfast. The control system interfaces directly with the booking system: rooms only reach the set temperature when guests arrive. Surplus solar power heats the domestic hot water, ensuring the electricity balance remains close to zero. Through the TIBA3 dashboard, the owner maintains full control.
  • ZOO Planckendael

    At ZOO Planckendael, Fixsus collaborated with Gezel to implement the building automation for the Entrance and Vennecourt zones.

    TIBA3 integrates the heating and cooling production, air handling units, fire dampers, and energy meters of multiple buildings. The facility manager monitors both zones centrally from a single overview.
  • Lievegem Sports Hall

    During the renovation of the Lievegem Sports Hall, the boiler room was completely modernized using Fixsus equipment and measuring instruments.

    Room Analyzers and TP10 panels manage the climate control in the offices, meeting room, and reception area. The sports hall itself is divided into twelve individually controlled zones.

Let’s get introduced

We are happy to assist you with any questions regarding your building management system.