The project

For WDP Warehouse De Pauw, an office building in Kobbegem was prepared for a new owner: Delhaize. The building had to be fully compliant, reliable, and ready for use once again.

The challenge lay in modernizing the existing electrical installation without replacing the entire infrastructure.

Our approach

We opted for a targeted retrofit approach where existing installations were preserved as much as possible and centrally controlled from a single system.

All technologies were realigned and integrated into one clear structure. This creates a transparent and manageable whole, with more control and less complexity.

Technologies in this project

  • Lighting control based on occupancy via control panels, motion detectors, and push buttons
  • Control of screens, emergency lighting, and air handling units
  • Cascade control of heat pumps for heating and cooling
  • Time programming of outdoor lighting

Fixsus fixes it for you too

Want to manage your building in an instant? With the open, proven,
practical, and modular approach of Fixsus, we provide a professional
solution tailored to every project.

TIBA3 (Total Integrated Building Automation) is the software core of the Fixsus building management system. It brings all building technologies together in one open, centrally controlled platform. This provides you with overview, control, and flexibility, without being dependent on a single supplier.