The project

In one of the largest government buildings in Brussels, the existing building management system was completely end-of-life. Malfunctions were increasing and spare parts were no longer available. A traditional retrofit would have had a heavy impact on the building’s operations. Therefore, a well-considered conversion to an open building management system was chosen, preserving the existing infrastructure and ensuring minimal disruption for the users.

Our approach

Fixsus opted for a phased retrofit where existing installations were preserved as much as possible.

  • Central intelligence was implemented in a single system, replacing dozens of outdated controllers
  • Prefabricated components ensured rapid installation on-site
  • Conversion was carried out floor by floor and in phases, without impacting daily operations
  • Existing cabling and technologies were reused
  • The client’s technicians were actively involved in analysis and fine-tuning

Technologies in this project

  • Heating
  • Cooling
  • Sun protection (screens and slats)
  • Lighting

Openness was crucial. We had to be able to interface with existing technologies. You don’t just tear out that kind of infrastructure.

Koen – Facility Manager

Fixsus fixes it for you too

Want to manage your building with ease? With the open, proven,
practical, and modular approach of Fixsus, we provide a professional solution
tailored to every project.

TIBA3 (Total Integrated Building Automation) is the software core of the Fixsus building management system. It brings all building technologies together into one open, centrally controlled platform. This gives you overview, control, and flexibility, without being dependent on a single supplier.